  • P3

This project consists of 2500 feet of a six-way, four inch communication duct bank with 6'x12' concrete manholes for pulling and splicing cables. Seven hundred feet of four-way, four inch power duct bank with 8'x8' concrete manholes extend the existing base power system to the new hangar. This duct houses two circuits fed by 1/0-35KV EPR cable in a radial configuration feeding 2500KVA and 1000KVA pad-mounted transformers servicing the hangar. Alternate power sources consist of a 1000KVA generator for building emergency systems and two 400HZ converters supplying ground power for the aircraft.