  • Explosives Handling Wharf

This project provides the second all-weather berthing facility for on-board loading of Trident missiles at NSB Kings Bay. Forward and aft service hoods provide power to the submarines while berthed at the facility. The power source is provided through 12.47KV double ended substations stepping down to 480 volts. An extensive ductbank system is installed on the wharf and shore for power and communication. High bay lighting is installed under the cover, along with a two-story, 20,000 square foot support building.